Sage Mill
Sage Mill, SC
Avgeris is partnered with Karis on this 266.1 acres in Sage Mill Technology Park, adjacent to the newly announced Meta data center. The site offers immediate scale in a proven data center corridor with strong regional infrastructure and utility alignment
Main Details
- Type: Land
- Site Size: 266.1 Acres
Property Details
- Power: 202 MW will be available at 220 kV by late 2025 via existing infrastructure from Santee Cooper. The actual 35 kV interconnect will be constructed by the developer. LIS is underway, with verbal confirmation received and final results expected in August 2025. Long-term planning includes a dual-feed configuration from Dominion (south) and Santee Cooper (north), supporting more than 500 MW of capacity by 2030.
- Providers: Zayo and Windstream long-haul fiber routes are located within 1 mile of the site, providing scalable, low-latency connectivity.
- Zoning: Fully zoned and annexed for data center development. The site is master planned for five 72 MW buildings totalling 1.6 million square feet.
Listing Agents
Avgeris and Associates, Inc.
(630) 620-8684
Avgeris and Associates, Inc.
2500 S. Highland Avenue, Suite 103
Lombard, IL 60148
View Property Website Here!
